On 28th Jan, 2021, Vice Secratary of Indu District Mr. Wang Lei, Secratary of Shuiye Country Mr. Hao Haitao, Visited Anyang Longteng’s Φ114 hot rolled seamless pipe project site. Mr. Feng Dibao, Chairman of Yulong Group, Mr. Feng Bo, General manager of Anyang Longteng warmly welcome show visitors around.
Chairman Mr. Feng Dibao gave a presentation on enterprises running, transforming, new project scheme, developing strateries, products design, marketing and our problems.
Φ114 Hot-rolled Seamless Pipe Project Started building from April 15th, 2020, which marks Yulong Group’s stratery put into effect. Yulong Group invested 650,000,000 RMB on this project, target production capacity 300,000 Tons per year. Till Now, all buildings, frastructions are all in position, all facilities are ready. Production is planing to start at the end of March.
Our Φ114 Hot-rolled Seamless Pipe Production Line is the 3rd line of the most advanced small diameter continuous mill in China, producing seamless pipes for API, fluid convey, high pressure boiler, low-medium boiler, hydraulic pipes, cylinder pipes, constructional pipes, shipbuilding seamless pipes, axle pipes, etc.